With the raising of systematic complexity and automation level, the application of Phased Mission System (PMS) increases. Comparing with unitary stage system, the reliability analysis of PMS becomes more complex because of the correlation between stages. After brief introduction for PMS, this paper builds the fault tree model for PMS reliability analysis. Taking certain PMS as an example, several calculation methods are compared.
参考文献
相似文献
引证文献
引用本文
邢涛.多阶段任务系统可靠性建模研究[J].海军航空大学学报,2006,21(1):172-174XING Tao. Research on the reliability model for phased mission system[J]. JOURNAL OF NAVAL AVIATION UNIVERSITY,2006,21(1):172-174