PERT方法优化的导弹技术准备流程
DOI:
作者:
作者单位:

(海军装备部军械保障部,北京 100841)

作者简介:

通讯作者:

中图分类号:

E927

基金项目:


Optimization Analysis of Missiles’Technical Preparation Process Based on PERT
Author:
Affiliation:

(The Ordnance Support Branch of NED,Beijing 100841,China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对导弹技术准备流程中各工序工时的不确定性特点,采用PERT方法建立了流程的网络模型,通过模型求解,得到各工序的开工时间范围,找出影响流程工期长短的关键路线,并估算出流程在不同工期下的实现概率。以某型导弹技术准备的子流程为例进行了实例研究,表明该方法对于提高保障部队技术准备能力具有重要现实意义。

    Abstract:

    Considering the uncertainty of the work duration of missiles’ technical preparation process, a network model of the process was built using PERT. We can obtain span of starting time of each work, and find the critical path which determines the total duration of the process, and estimate different probabilities under different durations. An example of studying a sub-process of a certain missile’s technical process using PERT was given to indicate that it had important practical significance to improve the capability of technical preparation of the missile guaranteeing unit.

    参考文献
    相似文献
    引证文献
引用本文

左传友. PERT方法优化的导弹技术准备流程[J].海军航空大学学报,2008,23(5):569-572
ZUO Chuan-you. Optimization Analysis of Missiles’Technical Preparation Process Based on PERT[J]. JOURNAL OF NAVAL AVIATION UNIVERSITY,2008,23(5):569-572

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2018-07-05
  • 出版日期: